3 hours ago, prince al said:

Has this debacle ever happened before in Sheffield?

There was the Sevenstone farce.

 

https://www.architectsjournal.co.uk/news/developer-pulls-out-of-sevenstones-scheme

And this is a good read:

 

Sheffield: A city locked in a drawn-out retail battle
Undelivered city centre schemes and attempts to block out-of-town developments are hampering Sheffield’s regeneration

https://www.architectsjournal.co.uk/news/sheffield-a-city-locked-in-a-drawn-out-retail-battle

Edited by alchresearch

Share this post


Link to post
Share on other sites
14 hours ago, kaytie said:

Omnishambles!   I read that it wasn't realised that the site used to be a reservoir!   Ffs I can recall that it was a reservoir when I was a little kid!

 

 

Of course they knew it was. They just ignored it. Another contractor told them not to build there, but they went with a cheaper rival who said "no problem".

Share this post


Link to post
Share on other sites

There’s another big hole on the other side of Northumberland Rd that has been subject to attempted development that was abandoned. There’s often a good reason why high value land hasn’t been built on.

Share this post


Link to post
Share on other sites
9 hours ago, alchresearch said:

There was the Sevenstone farce.

 

https://www.architectsjournal.co.uk/news/developer-pulls-out-of-sevenstones-scheme

And this is a good read:

 

Sheffield: A city locked in a drawn-out retail battle
Undelivered city centre schemes and attempts to block out-of-town developments are hampering Sheffield’s regeneration

https://www.architectsjournal.co.uk/news/sheffield-a-city-locked-in-a-drawn-out-retail-battle

A lot has happened in the seven years these articles were written. Some has been complete with much more in various stages of constructions.

This thread is about a private construction gone wrong.

Share this post


Link to post
Share on other sites
9 hours ago, nightrider said:

Of course they knew it was. They just ignored it. Another contractor told them not to build there, but they went with a cheaper rival who said "no problem".

Typical penny-pinching Sheffielders 🤣

Share this post


Link to post
Share on other sites
On 08/09/2020 at 19:52, kaytie said:

Omnishambles!   I read that it wasn't realised that the site used to be a reservoir!   Ffs I can recall that it was a reservoir when I was a little kid!

 

 

Of course they knew there was a reservoir there... Their issue relates to not properly designing for that fact.

 

 

On 09/09/2020 at 00:17, AlexHudson39 said:

A setback, but nothing more. This will be a great new addition for Sheffield Uni and the design is very elegant. 

 

 

I've no doubt the issues will be resolved and in a decade or mores time people will have largely forgotten about this, but to refer to this as nothing more than a setback is a truly heroic stretch of positive thinking! Getting this far in to the build of quite a large building only to discover someone has screwed up so badly that it needs to be taken down again - that is quite a major setback. Even if the extra construction costs are covered somehow by insurance, the University are still going to suffer by way of this facility being probably 6-12 months behind schedule now?

 

 

On 09/09/2020 at 09:50, alchresearch said:

There was the Sevenstone farce.

 

https://www.architectsjournal.co.uk/news/developer-pulls-out-of-sevenstones-scheme

And this is a good read:

 

Sheffield: A city locked in a drawn-out retail battle
Undelivered city centre schemes and attempts to block out-of-town developments are hampering Sheffield’s regeneration

https://www.architectsjournal.co.uk/news/sheffield-a-city-locked-in-a-drawn-out-retail-battle

This is about a private-developer scheme that hasn't been properly engineered/designed and so needs to be partly or fully taken down. How does that relate to the retail quarter situation?

 

 

Edited by AndrewC

Share this post


Link to post
Share on other sites

We are not alone ,that glittering city across the hills is also taking down abrand new  block of apartments as they are also unsound

Share this post


Link to post
Share on other sites
21 hours ago, butlers said:

We are not alone ,that glittering city across the hills is also taking down abrand new  block of apartments as they are also unsound

which proves the 'only happens here' stuff is codswallop.....

Share this post


Link to post
Share on other sites

Unless you are a qualified structural or geotechnical engineer you should really not speculate on matters you know nothing about. BAM are still main contractor on this scheme so those commenting that Kier are back on the job know nothing. Normally on projects like this the piling contractor is responsible for both the design and construction of the pile foundations, the engineers just provide the loads and performance specification eg what the maximum settlement should be. For those on this forum claiming the architects are responsible and not competent, HLM design multi-million pound University buildings all over the UK, have an excellent track record and years of experience on schemes like this. HLM will have had nothing at all to do with the supervision or design of the foundations, this responsibility normally sits with the piling contractor. 

Share this post


Link to post
Share on other sites
11 hours ago, Pacman38 said:

Unless you are a qualified structural or geotechnical engineer you should really not speculate on matters you know nothing about. BAM are still main contractor on this scheme so those commenting that Kier are back on the job know nothing. Normally on projects like this the piling contractor is responsible for both the design and construction of the pile foundations, the engineers just provide the loads and performance specification eg what the maximum settlement should be. For those on this forum claiming the architects are responsible and not competent, HLM design multi-million pound University buildings all over the UK, have an excellent track record and years of experience on schemes like this. HLM will have had nothing at all to do with the supervision or design of the foundations, this responsibility normally sits with the piling contractor. 

Anyone would think you had a connection to HLM design

Share this post


Link to post
Share on other sites

Aye I am glad the thread got bumped 9 months after the last post for him to tell us that

Share this post


Link to post
Share on other sites

Imagine having to take to a little internet forum to rep your company after it got a little bit of criticism.

 

Says alot.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.