bladebeer   11 #1 Posted January 18, 2018 How long are the roadworks at Asda Handsworth going to take.It is absolute chaos all day with the road down to one lane.There never seems to be anybody working on it apart from one bloke sitting in a JCB. Share this post Link to post Share on other sites Share this content via...
Bricky1 Â Â 10 #2 Posted January 18, 2018 If I performed like those Clowns (Amey) I would lose my job. The kerbs have been in weeks and still it's not finished. Share this post Link to post Share on other sites Share this content via...
Dggsheffield   10 #3 Posted January 18, 2018 why do they even need to alter the kerbs in the first place.  Amey need to be concentrating now on repairing the shattered tarmac roads their contractors have laid. Share this post Link to post Share on other sites Share this content via...
alarmingmark   32 #4 Posted January 18, 2018 To put the new bus stop in ! Don't think think it's wide enough to help.... hope they got the measurements right .... Share this post Link to post Share on other sites Share this content via...
jacklev1   12 #5 Posted January 18, 2018 (edited) Let’s all face it There one big joke ,there so called planners I’d sack the lot of them is there anything they are good at .to think we pay them as well Edited January 18, 2018 by jacklev1 Share this post Link to post Share on other sites Share this content via...
bladebeer   11 #6 Posted January 18, 2018 Whoever puts out the filter signs must be an idiot ,most days you have to filter to the outside lane, but one day last week ,the signs told you to filter out ,then when we got to the works they had opened up the inside lane but left the signs as they were. I honestly don't think they have a clue. Share this post Link to post Share on other sites Share this content via...
jacklev1   12 #7 Posted January 18, 2018 Like I say would not pay them out in peanuts the lot off them embarrassing but it’s the people at the top that need sorting out idiots Share this post Link to post Share on other sites Share this content via...
Bricky1 Â Â 10 #8 Posted January 18, 2018 Another large contractor awarded loads of government and council contracts. I've complained about Amey on numerous occasions. Badger Road was completely relaid around 2 years ago and already breaking up with numerous potholes that have been filled in then open up again. Obviously not correctly in the first place. There's a crater near Goathland Road that gets wider and deeper everyday!! Share this post Link to post Share on other sites Share this content via...
haddy   10 #9 Posted January 18, 2018 Part of woodhouse village was done not so long go and that's breaking up Share this post Link to post Share on other sites Share this content via...
Odd-jobs   10 #10 Posted January 18, 2018 Part of woodhouse village was done not so long go and that's breaking up  Stradbroke Road near the Co op was resurfaced the week before Christmas. It's been dug up twice since by one of the utilities. Share this post Link to post Share on other sites Share this content via...
top4718 Â Â 838 #11 Posted January 18, 2018 What makes this situation worse is they've also had the road to Orgreave closed for resurfacing, why do both these at the same time, idiots. Share this post Link to post Share on other sites Share this content via...
bladebeer   11 #12 Posted January 23, 2018 Back to previous posts re. Road works at Handsworth, Amey in their wisdom decided to relay the surface on Laverack Street, thus causing all traffic to re route from going down Richmond Road to go down Richmond Park Road and into the chaos being caused by the works still going on (forever) at the Asda .Could the re surfacing not have waited until the other job was done or is that too simple? Share this post Link to post Share on other sites Share this content via...