Jump to content

Roadworks Handsworth

Recommended Posts

How long are the roadworks at Asda Handsworth going to take.It is absolute chaos all day with the road down to one lane.There never seems to be anybody working on it apart from one bloke sitting in a JCB.

Share this post


Link to post
Share on other sites

If I performed like those Clowns (Amey) I would lose my job.

The kerbs have been in weeks and still it's not finished.

Share this post


Link to post
Share on other sites

why do they even need to alter the kerbs in the first place.

 

Amey need to be concentrating now on repairing the shattered tarmac roads their contractors have laid.

Share this post


Link to post
Share on other sites

To put the new bus stop in ! Don't think think it's wide enough to help.... hope they got the measurements right ....

Share this post


Link to post
Share on other sites

Let’s all face it There one big joke ,there so called planners I’d sack the lot of them is there anything they are good at .to think we pay them as well :(

Edited by jacklev1

Share this post


Link to post
Share on other sites

Whoever puts out the filter signs must be an idiot ,most days you have to filter to the outside lane, but one day last week ,the signs told you to filter out ,then when we got to the works they had opened up the inside lane but left the signs as they were. I honestly don't think they have a clue.

Share this post


Link to post
Share on other sites

Like I say would not pay them out in peanuts the lot off them embarrassing but it’s the people at the top that need sorting out idiots

Share this post


Link to post
Share on other sites

Another large contractor awarded loads of government and council contracts.

I've complained about Amey on numerous occasions.

Badger Road was completely relaid around 2 years ago and already breaking up with numerous potholes that have been filled in then open up again.

Obviously not correctly in the first place. There's a crater near Goathland Road that gets wider and deeper everyday!!

Share this post


Link to post
Share on other sites

Part of woodhouse village was done not so long go and that's breaking up

Share this post


Link to post
Share on other sites
Part of woodhouse village was done not so long go and that's breaking up

 

Stradbroke Road near the Co op was resurfaced the week before Christmas.

It's been dug up twice since by one of the utilities.

Share this post


Link to post
Share on other sites

What makes this situation worse is they've also had the road to Orgreave closed for resurfacing, why do both these at the same time, idiots.

Share this post


Link to post
Share on other sites

Back to previous posts re. Road works at Handsworth, Amey in their wisdom decided to relay the surface on Laverack Street, thus causing all traffic to re route from going down Richmond Road to go down Richmond Park Road and into the chaos being caused by the works still going on (forever) at the Asda .Could the re surfacing not have waited until the other job was done or is that too simple?

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.