bazjea   10 #73 Posted June 29, 2017 (edited) just had a walk down Far lane and down rest of Wadsley lane, (about 2.30 ish) both got signs up saying roads closed. I don't know if its just me, but a can't tell what they are doing, it looks no different from yesterday apart from a few trucks parked up at the bottom of Wadsley lane. I have seen sign whats says roads in this area will be done for July, do they mean july this year, or is it sometime between now and July 2020.  Far lane had notices up yesterday saying that it will be closed for 3 days from 30 june 7am-7pm.which is tomorrow Also in view of the amount of rain we have had over the last couple of days would it be feasible to have the Tarmac lorries turn up and lay it in that weather Edited June 29, 2017 by bazjea Share this post Link to post Share on other sites Share this content via...
Ms Macbeth   73 #74 Posted June 29, 2017 Get in touch with Amey and ask, I got a phone call back to explain that they were done planing and it was good enough. I said I'd take photos and if it all fails come winter I'll be sure to share them.  Rang them and they said an inspector would have a look and perhaps arrange for a sweep. It'll be interesting to see the outcome. Some pretty big stones being thrown up by passing vehicles. Share this post Link to post Share on other sites Share this content via...
Cyclone   10 #75 Posted July 5, 2017 Wadsley Lane is closed today.  They haven't put a sign up on Marlcliffe though until you are right on top of it. Great planning Amey. Would a sign at the other end of Marlcliffe be too much to ask? Share this post Link to post Share on other sites Share this content via...
BHRemovals   10 #76 Posted July 5, 2017 half the new surface work is cracking already. Share this post Link to post Share on other sites Share this content via...
bazjea   10 #77 Posted July 5, 2017 half the new surface work is cracking already.  Which half of the new surface in Hillsborough is cracking already Share this post Link to post Share on other sites Share this content via...
Mr Bloke   1,445 #78 Posted July 5, 2017 Which half of the new surface in Hillsborough is cracking already Hmmm...  ... I'll have a guess that it's the top half! Share this post Link to post Share on other sites Share this content via...
Ms Macbeth   73 #79 Posted July 5, 2017 Rang them and they said an inspector would have a look and perhaps arrange for a sweep. It'll be interesting to see the outcome. Some pretty big stones being thrown up by passing vehicles.  The notices said we had to move our cars last Friday, 30th. We went to Scotland that morning before they were due to start, we've just arrived back home six days later, the surface hasn't been done, and there are no signs on the road. Will try and catch a neighbour tomorrow to see if he knows what happened. Not impressed. Share this post Link to post Share on other sites Share this content via...
Tiberius   10 #80 Posted July 6, 2017 The new tarmac around me has been reasonably good, however my only annoyance is the water mains bursting within a few days after. The roller and vibrations must fracture the fragile pipes. Therefore the road is dug up again withing week! Noticed it on quite a few roads. Guess who the contractor was for Yorkshire water? Share this post Link to post Share on other sites Share this content via...
feargal   21 #81 Posted July 6, 2017 The new tarmac around me has been reasonably good, however my only annoyance is the water mains bursting within a few days after. The roller and vibrations must fracture the fragile pipes. Therefore the road is dug up again withing week! Noticed it on quite a few roads. Guess who the contractor was for Yorkshire water? This isn't what's happened on Ben lane, its a spring, which nobody will redirect. Its been going on for years, and endless cycle of patch and run. Share this post Link to post Share on other sites Share this content via...
autumn   10 #82 Posted July 11, 2017 So the signs are up again around Hillsborough this time each sign is saying closed for 6 days .Can they Tarmac in the rain or will said signs be made null and void again? Share this post Link to post Share on other sites Share this content via...
Ms Macbeth   73 #83 Posted July 11, 2017 So the signs are up again around Hillsborough this time each sign is saying closed for 6 days .Can they Tarmac in the rain or will said signs be made null and void again?  The man I spoke to from the Streets Ahead team suggested that bad weather was part of the reason work didn't get done before. We've not moved our car today and there's no sign of any activity even though the latest signs say work will start today.  I won't hold my breath! Share this post Link to post Share on other sites Share this content via...
autumn   10 #84 Posted July 12, 2017 They have changed the dates again this morning ! Share this post Link to post Share on other sites Share this content via...