Jump to content

Leppings Lane roundabout alterations

Recommended Posts

well came through tonight at 5.30pm, all lanes open and scarcely a car in sight ! it was a heavenly run :)

 

---------- Post added 16-10-2014 at 18:59 ----------

 

Saw something very similar to this the other day except in daylight. Got in Morrison's lane, swerved all the way left then swerved back right to get into the coned off right lane. All happened just in front of me but luckily nobody alongside & I drive the route every day so try to give plenty of space (notwithstanding terrible driving it is still a fairly shoddy bit of road at the moment!).

 

I too witnessed one of these earlier in the week ! it was slightly bemusing to observe (I was the car behind, fortunately with a good amount of distance between us), but could have had disastrous consequences

Share this post


Link to post
Share on other sites

I think everybody has moved onto Jawbone. There must have been 50 cars queuing at the bridge 630tonight.

Share this post


Link to post
Share on other sites

how many times does the tarmac need to be re-layed in that area ?? came passed today only to see road ready to be done again must cost loads to put it down , dig up again and put it down again n again:loopy::rolleyes:

Share this post


Link to post
Share on other sites
Yep, driving in Sheffield at the moment is an absolute chore.

Get through all the carnage in Sheffield, then its 50mph on the motorway in every direction! ARGHH! :(

 

Driving in Sheffield (particularly in the peak hours) is always a chore.

Actually, driving in any city (or even town.....) is a chore in the rush hour.

 

Final point. Am I the only one who finds that traffic (apart from in the rush hours) is actually busier on Sundays than in the week ?

Share this post


Link to post
Share on other sites

Just been out only to find that you cant turn right at the bottom of Bamforth St on to Penistone Road, should be fun in the morning!

Share this post


Link to post
Share on other sites
Just been out only to find that you cant turn right at the bottom of Bamforth St on to Penistone Road, should be fun in the morning!

 

That's just happened then, as they were still doing it at around 5pm as I drove along Penistone Road.

Share this post


Link to post
Share on other sites

Aren't they starting the resurfacing overnight now or soon which means temporary alterations and closures to surrounding roads ?

Share this post


Link to post
Share on other sites

taken from facebook page - sheffield online

 

 

https://www.facebook.com/onlinesheffield?fref=nf

ROADS TO CLOSE AS WORK CONTINUES ON NEW SHEFFIELD SUPERMARKET

Overnight road closures around the site of a new Sainsbury’s store being built in Wadsley Bridge are in place this week until Friday.

The supermarket chain will close Claywheels Lane, Beeley Wood Road and part of Penistone Road northbound from 7pm to 6am.

A diversion will take motorists from Claywheels Lane to Limestone Cottages Lane, Hagg Hill, Midhurst Road and Foxhill Road on to Penistone Road.

Lorries which need access to businesses will be escorted through the area.

A Sainsbury’s spokesman said: “We would like to apologise for the inconvenience caused and thank you for your continued patience while we complete the road works. This will be the last time we need to carry out road closures or significant night works outside the sit

Edited by small_hall

Share this post


Link to post
Share on other sites
taken from facebook page - sheffield online

And that with a football match on at Owlerton this evening kick of 7-45 PM.

Share this post


Link to post
Share on other sites

About 10-30 this morning it took me nearly 40 minutes to get from Lidle on Halifax Road to Kilner Way, only time the traffic moved was when someone did a u turn to try a different route, I put radio Sheffield on to see what the problem was and they said that there was a supertram accident on Penistone Road :huh: must have been some accident for the tram to finish up on Penistone Road. :hihi:

Share this post


Link to post
Share on other sites

i noticed a sign about the disruptions on the way home stating that works would commence on 10th November for 3 weeks. The roads will be closed between 7am & 7pm monday to friday. ( i think that were the times.. it could have been between 7pm & 7am).

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.