andycol #1 Posted November 10, 2012 Can anyone tell me, when the council intend to re-surface the main road through Crookes, the surface is a complete and utter disgrace, they are wasting time doing more than adequate roads in Parson Cross, when we are banging about and doing damage to our cars!!! Share this post Link to post Share on other sites Share this content via...
Lushcannon #2 Posted November 10, 2012 There are worse roads than Crookes.They'll all get done before 2052... Share this post Link to post Share on other sites Share this content via...
RosyRat #3 Posted November 10, 2012 There you go. You can see the whole Streets Ahead schedule : https://www.sheffield.gov.uk/roads/works/schemes/streetsaheadproject/works-schedules/works-map.html Share this post Link to post Share on other sites Share this content via...
sydneyoss #4 Posted November 10, 2012 we drive a lot faster on the cross need better roads Share this post Link to post Share on other sites Share this content via...
Lushcannon #5 Posted November 10, 2012 There you go. You can see the whole Streets Ahead schedule : https://www.sheffield.gov.uk/roads/works/schemes/streetsaheadproject/works-schedules/works-map.html Only 2 more years to wait then.Hope my 50 year old car survives that long... Share this post Link to post Share on other sites Share this content via...
the_rudeboy #6 Posted November 10, 2012 Can anyone tell me, when the council intend to re-surface the main road through Crookes, the surface is a complete and utter disgrace, they are wasting time doing more than adequate roads in Parson Cross, when we are banging about and doing damage to our cars!!! The council won't be resurfacing it, for the next 25years its the responsibility of the winning highways PFI bidder, Amey. Share this post Link to post Share on other sites Share this content via...