Jump to content

Digital Region Project may seek commercial operator to rescue it

Recommended Posts

Yet when an area has been Digital Region enabled then miraculously BT bring FORWARD their roll out in that area. Coincidence? I think not.

 

Pretty flawed that argument to be honest, we got bt fibre at the estimated "live" date and we cant get DR or virgin. If your statement had any substance, surely BT wouldn't have bothered with our area.

 

 

I was quoted at least 18 months to get BT fibre Origin within days

within a month or so there was a box advertising BT fibre to the area funny that isn't it

 

 

Posted from Sheffieldforum.co.uk App for Android

 

So basically your saying they altered their fibre roll out plan, installed the cabinet, powered it, installed the fibre cable and tested it all up and running within one month? what planet do you think I was born on?

Share this post


Link to post
Share on other sites
Pretty flawed that argument to be honest, we got bt fibre at the estimated "live" date and we cant get DR or virgin. If your statement had any substance, surely BT wouldn't have bothered with our area.

 

Once they decided to start rolling out South Yorkshire then all bets are off. They already started laying extra fibre and equipment in exchanges to handle the areas that ARE Digital Region enabled. By that point it makes sense to roll out to areas that aren't too.

 

Its impossible to say if they would have done that or not without Digital Region, but we do know Digital Region got their funding because BT were unwilling to commit to doing South Yorkshire at the time.

Edited by AlexAtkin

Share this post


Link to post
Share on other sites
So basically your saying they altered their fibre roll out plan, installed the cabinet, powered it, installed the fibre cable and tested it all up and running within one month? what planet do you think I was born on?

 

Whatever planet it is it's not one that teaches reading actual sentences

Show me where I said any of that apart from installing the cabinet

 

Just to remind you what I actually said rather than what you thought I said here it is

 

I was quoted at least 18 months to get BT fibre Origin within days

within a month or so there was a box advertising BT fibre to the area funny that isn't it

Share this post


Link to post
Share on other sites
Whatever planet it is it's not one that teaches reading actual sentences

 

The planet I'm from, we use punctuation, It makes sentences a little easier to follow ;)

 

For example. What the hell is "BT fibre Origin" ?

Share this post


Link to post
Share on other sites
Quote:

 

Originally Posted by Paul Blade

 

Whatever planet it is it's not one that teaches reading actual sentences

 

The planet I'm from, we use punctuation, It makes sentences a little easier to follow

 

For example. What the hell is "BT fibre Origin" ?

 

Well please excuse me for missing out a comma.

If you have no answer fall back on the spelling and punctuation.

The laughable thing is it makes perfect sense, (comma there) the full sentence, (and there) but admittedly the 2 letters and 2 words you took out of context doesn't.

Try reading the full sentence.

(I will insert comma just to please you)

 

I was quoted at least 18 months to get BT fibre, (note the comma) Origin within days, (and there) within a month or so there was a box advertising BT fibre to the area.

BTW there is no need to put a capital I in it, after a comma, it is not a new sentence.

There should also be a full stop at the end of the first sentence

If you are going to be a pedant, and pull people up on their punctuation make sure you are bullet proof

Posted from Sheffieldforum.co.uk App for Android

Edited by Paul Blade

Share this post


Link to post
Share on other sites
Well please excuse me for missing out a comma.

If you have no answer fall back on the spelling and punctuation.

The laughable thing is it makes perfect sense, (comma there) the full sentence, (and there) but admittedly the 2 letters and 2 words you took out of context doesn't.

Try reading the full sentence.

(I will insert comma just to please you)

 

I was quoted at least 18 months to get BT fibre, (note the comma) Origin within days, (and there) within a month or so there was a box advertising BT fibre to the area.

BTW there is no need to put a capital I in it, after a comma, it is not a new sentence.

There should also be a full stop at the end of the first sentence

If you are going to be a pedant, and pull people up on their punctuation make sure you are bullet proof

Posted from Sheffieldforum.co.uk App for Android

 

I'm being pedant? you pulled me on my reading skills---

Whatever planet it is it's not one that teaches reading actual sentences

 

I was quoted at least 18 months to get BT fibre

 

You do realise that estimated times are grossly exaggerated to allow for any problems installing the network, problems powering up, blocked ducting etc. We were estimated originally for December 2013, due to little issues it was live march 2013. The estimate was changed about June/July 2012.

 

How do you know the BT fibre network in your area wasn't practically ready to go "live" in your area anyway? When my son spoke to BT in February 2013, he was told there was a delay and it could be another six months.

 

Your previous post assumes that BT was installed within "A month" or so" just because DR was already "live" and that is utter crap. Most of the network must have already been installed because as I have said, to achieve what you said is impossible.

Share this post


Link to post
Share on other sites
I'm being pedant? you pulled me on my reading skills---

 

Straight after you accused me of lying

 

 

You do realise that estimated times are grossly exaggerated to allow for any problems installing the network, problems powering up, blocked ducting etc. We were estimated originally for December 2013, due to little issues it was live march 2013. The estimate was changed about June/July 2012.

 

How do you know the BT fibre network in your area wasn't practically ready to go "live" in your area anyway? When my son spoke to BT in February 2013, he was told there was a delay and it could be another six months.

 

Your previous post assumes that BT was installed within "A month" or so" just because DR was already "live" and that is utter crap. Most of the network must have already been installed because as I have said, to achieve what you said is impossible.

 

You made an assumption that I said that

Quote

"altered their fibre roll out plan, installed the cabinet, powered it, installed the fibre cable and tested it all up and running within one month"

 

I have shown you what I said twice, and asked for proof what you said I said , but evidently you cannot, so you picked me up on 2 letters and 2 words, out of a sentence of 26 words 2 numbers and 2 letters.

 

I will put it in simple terms what I said so there is no mistake.

 

I got in touch with BT about FTTC they said 18 months before I could get it.

 

Origin said within days as soon as I filled the forms in

 

Within a month or so of me joining Origin there was a cabinet at the side of the Origin one advertising BT Infinity.

Whether they have "they altered their fibre roll out plan, installed the cabinet, powered it, installed the fibre cable and tested it all up and running within one month" I DO NOT KNOW.

 

All I can say is that there was a cabinet at the side of the Origin one.

 

IMO the ones at fault are BT, but you won't accept that will you?

Edited by Paul Blade

Share this post


Link to post
Share on other sites
Straight after you accused me of lying

 

When on this thread have I ever done that?

 

You made an assumption that I said that

Quote

"altered their fibre roll out plan, installed the cabinet, powered it, installed the fibre cable and tested it all up and running within one month"

 

Yes I did, because you made the assumption that BT only rolled out because DR was in the area all set up and "live" which isn't the case, if it was, BT wouldn't have been able to achieve that in the time scale you said. Impossible.

 

I was quoted at least 18 months to get BT fibre Origin within days

within a month or so there was a box advertising BT fibre to the area funny that isn't it

 

Have you not read anything I have said about BT rollout, remember this is from experience, not from "what I think has happened or not happened"

 

Let me remind you-

 

We were estimated originally for December 2013, due to little issues it was live march 2013.

 

That's nine months before original estimated "live" date.

Also-

 

we cant get DR or virgin.

 

Remember this too?

 

When my son spoke to BT in February 2013, he was told there was a delay and it could be another six months.

 

Three weeks later were "live".

 

IMO the ones at fault are BT, but you won't accept that will you?

 

BT are at fault? fault of what? not being able to give you an exact date and time when you would be able to use their fibre network?

 

You are assuming all the way, I'm working on experience.

 

but you won't accept that will you?

 

No I wont, there's no substitute for experience :)

 

You just wont except the fact you might be wrong ;)

 

 

;)

Share this post


Link to post
Share on other sites

dr cost 100,000,000 and got 3000 customers, thats 33,333 prr customer, now thats what i call well run, the problem in sheffield was they put it near the centre and forgot people live further out so it was never going to work.

its either going to be run by bt or boynges telecom who are french!

 

 

Posted from Sheffieldforum.co.uk App for Android

Share this post


Link to post
Share on other sites

I would much rather BT take it over than some French company I've never heard of.

Share this post


Link to post
Share on other sites
I would much rather BT take it over than some French company I've never heard of.
God help us if BT takes over. at least you can speak to a human being within seconds at Origin if needed.

I have found them more than helpful,unlike big company deflective operatives that habitually lie through their teeth to get back to drinking coffee...............and that can be after an hours wait at the end of a menu to even talk to them.

Share this post


Link to post
Share on other sites
dr cost 100,000,000 and got 3000 customers, thats 33,333 prr customer, now thats what i call well run, the problem in sheffield was they put it near the centre and forgot people live further out so it was never going to work.

its either going to be run by bt or boynges telecom who are french!

 

I assume by "put it near the centre" you mean that they didn't do the extremely rural areas where it would have meant laying miles of fibre before even reaching an habited area. In which case, of course they didn't, that is hardly cost effective.

 

The plan was to lay it in highly populated areas, make a profit, then use that profit to cover the expense of reaching the rural areas. Unfortunately they made a massive assumption that ISPs would pay for all advertising of the network and so when no large ISP came on board, and phase 2 was dead in the water as none of the small ISPs had the money to advertise heavily enough.

 

What really ****** me of is that BT stick those massive "Fibre broadband" adverts on their cabinets, but Digital Region did not. Since then Origin have gone out and stuck adverts on some cabinets, but it was a bit late and they aren't as eye catching as the BT adverts.

 

God help us if BT takes over. at least you can speak to a human being within seconds at Origin if needed.

I have found them more than helpful,unlike big company deflective operatives that habitually lie through their teeth to get back to drinking coffee...............and that can be after an hours wait at the end of a menu to even talk to them.

 

Actually BT would likely be an improvement as it wouldn't alter who you spoke to at the ISP, but it WOULD alter who THEY spoke to when altering your line settings. Thales have been terrible for not wanting to tweak line settings, BT on the other hand have dynamic line management so you would never NEED to alter line settings.

 

While I do not entirely trust DLM myself, there is plenty of evidence to suggest that for most people its a huge improvement over the line settings Digital Region are willing to use.

Edited by AlexAtkin

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.