xgrifterx   10 #1 Posted January 24, 2012 Hi all  Local residents just received letter from yorkshire water and utility company stating that major water main replacement will be taking place in grenoside and on a61 from 6th feb 2012 onwards for a minimum of 7 weeks.  the a61 will be traffic light controlled from salt box lane/wheel lane to past norfolk hill/norfolk arms pub.  the majority of roads in/out of grenoside will be closed in a staggered programme starting with closure of wheel lane and salt box lane on 6th feb. the work and road closures will move in the direction of/towards norfolk hill. roads closed at any point will include salt box lane, wheel lane, school lane, norfolk hill and whitley lane.  the traffic will remain two way but light controlled on a61, but traffic will only be one way on norfolk hill (up in to the village when they reach that point.  i predict major delays! diversions will be in place, but they have not said where/which route  worth noting for anyone who travels along the a61 at any time. after the main work is complete, they will be coming back to test/chlorinate etc so there will be more short term works after this batch.  happy driving!  xgx Share this post Link to post Share on other sites Share this content via...
Doom   10 #2 Posted January 24, 2012 Oh joy!!!!  I travel along the A61 to work and I regularly visit my parents who live at the bottom end of the Village.  It looks like I'll have some pain on.  Regards  Doom Share this post Link to post Share on other sites Share this content via...
Penistone999 Â Â 10 #3 Posted January 24, 2012 The way to aviod it is use the old road through Greno village ,then through Greno woods and come out at the by-pass juction At Wortley. Share this post Link to post Share on other sites Share this content via...
scimsfan   10 #4 Posted January 24, 2012 The way to aviod it is use the old road through Greno village ,then through Greno woods and come out at the by-pass juction At Wortley.  Ok using that route to head North in the morning or South in an evening, but the reverse ? Forget it. There's usually a huge queue from the end of Main Street back up to the park entrance every morning ! There was also major roadworks on Main Street North of Norfolk Hill the last time I went down there. Nightmare Share this post Link to post Share on other sites Share this content via...
TTM13   10 #5 Posted January 24, 2012 Yorkshire water have a page about it:  http://www.yorkshirewater.com/your-water-services/local-improvements/improving-water-quality-and-reliability/grenoside-a61.aspx  The PDF documents show you exactly where the roadworks will be. Nowt on the SCC site about it though Share this post Link to post Share on other sites Share this content via...
pippadoll   10 #6 Posted February 29, 2012 The change in the roadworks are causing horrendous tailbacks heading into the city; even at 7pm last night I was queuing for 15 minutes outside Grenoside. Share this post Link to post Share on other sites Share this content via...