Billy B   10 #1 Posted January 25, 2011 Hi would like someone to give me a quick qoute for the following work  2 x Shower trays to be resealed.  2 x Shower head and leads to be replaced  Tiled walls to be re grouted or sealed with plastic wall if thats correct  Work needs to be completed by 5th Feb Share this post Link to post Share on other sites Share this content via...
JBradleybz   10 #2 Posted January 25, 2011 hi sent you a pm Share this post Link to post Share on other sites Share this content via...
sbs builders   10 #3 Posted January 26, 2011 Hi sent you a p.m sothall building services Gary 07533 144116 kitchens,bathrooms,tileing,plumbing,plastering, joinery,painting/decorateing [email protected] Share this post Link to post Share on other sites Share this content via...
Billy B   10 #4 Posted January 26, 2011 Thanks everyone for your PMs and quotes the job has now gone  Regards  Billy B Share this post Link to post Share on other sites Share this content via...