Jump to content

Colin Foster

Members
  • Content Count

    869
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by Colin Foster


  1. Wallbuilder could be right. Just because the lights are working, it doesn't mean everything is ok with the cabling. Much of the street lighting in Sheffield is connected to a seperate 5th core switch wire, which means groups of lights are all switched on and off together from a switch point. In order for Amey to use a central monitoring system to control the lights, each light has to have it's own 'live' supply. This could involve quite a bit of excavation and alterations to the cabling network.

     

    As you say yourself, that's how most of the street lights are wired, from a local switching timer. I doubt that this is the only area, out of all the others where the new lights have been fitted, which is wired in this way. In any case, it shouldn't really be too big a problem, in order to make the switched live a permanent live I would imagine all that needs to be done is short the local clock switch.


  2. I'm curious have you bothered to ring them and ask what the problems are withthe street lighting installation, you can't say their info is rubbish as you've got nothing to back this up. maybe they've discovered that the electrical cables are in need of replacement which would of course mean any of the resurfacing work would have to be postponed till the cabling had been sorted. So rather than having plant and workforce say waiting they've moved on to other area's where they can do the work as that would seem to make sense.

     

    Oh don't talk rubbish, the old lights are working perfectly well.


  3. I've noticed the timescale for my area (Tapton Hill) has changed from ending in August to January. Apparently it says on SCC website pavement resurfacing has been delayed because of difficulties installing the new street lights, which is complete rubbish because they were supposed to do the lights in May and they're now installing them in Highfield which was not supposed to be until September. Instead they've spent over six weeks on my road farting around digging up kerbs there was nothing wrong with and making a complete pigs ear of the pavements and grass verges in the process. To add insult to injury, they sod off at 3pm and do not even appear at weekends. Not right impressed.


  4. According to the Councils website the footpaths and street lights in High Green should have been completed by the end of May.

     

    The date for the roads on our estate was up to the end of June.

     

    All the works I've noted above are still to be completed.....Where have Amey gone?

     

    Regards

     

    Doom

     

    The roads in our area have had all the kerbs replaced and the grass verges are a mess covered in aggregate so they're impossible to cut without knackering the mower and now it seems they've upped sticks and left.

     

    The area was also supposed to have had new street lights put in over May and June, but not a single one has been done. Last weekend I drove through Highfield and they have started putting new lights there. According to the schedule Highfield was supposed to start getting new lights in September. I hope our area hasn't been put to the back of the queue because they couldn't keep to schedule.


  5. been going to gym and swim for 2 years and never heard of anything stolen,but i use the male members changing rooms.

    the turnstiles have been broken for a week now and gate left open all the time nobody asks to see your card and you just walk through,this is very lax security and i always take my valuables in gym with me.am a bit nervous when i go to swim as this means leaving wallet and watch in locker.

     

    Do what I do, you can hand your valuables into reception and they are kept locked away in a secure staff only area free of charge.


  6. It's a good job we're less closed minded than you then, or nobody would have cared enough about your silly opinion on the flag to even reply to you.

     

    Which would have been such a shame.

     

    You've expressed your closed mindedness quite clearly anyway, claiming that you're not won't alter that.

     

    And you continuing to say I'm closed minded, as you seem to like saying, also won't make it true.


  7. they are special to us, they are commonwealth countries, infact wales has been a part of the UK for a fair while lol

     

    its called acknowledgment, respect of others

     

    would you rather NO flags are flown, until OUR special days?

    dont you think its a little boring, or boring to only fly our flag, i like the fact you can look and see what countries flags on there on any given day, variety

     

    I would rather our flag was flown every day. Wales has nothing to do with Sheffield.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.