If someone wanted to get simple garage extension with sloaping roof how long would this take to build if it was the builders sole piece of work and wasent off doing 4 jobs all at once.
cheers :)
cheers :)
|
View Full Version : Garage Extension, how long would it take MTheo 04-10-2009, 12:21 If someone wanted to get simple garage extension with sloaping roof how long would this take to build if it was the builders sole piece of work and wasent off doing 4 jobs all at once. cheers :) numero uno 04-10-2009, 19:06 4-6 weeks?? depends what its made from etc electricity what had to be taken down first et etc weather etc NUCAD 04-10-2009, 20:21 Circa 4weeks if its full time so long as weather permits and all required paperwork is in place |